Loading Solostar Port Energy
Loading Solostar Port Energy
Solutions
02The platform
Select a module to isolate its energy and data paths
Three layers
Physical Layer
Charging estate and civil infrastructure
SOLCHARGE PORT
Energy Layer
Grid, generation, storage and distribution
SOLGRID · SOLSTORAGE
Digital Layer
Intelligence, operations and reporting
SOLFLEET · SOLCOMMAND · SOLINSIGHT
Select any node in the diagram
High-power drayage & heavy fleet charging infrastructure
The unified heavy-duty charging estate across the marine terminal: administrative and staff parking, yard utility equipment, commercial fast charging courts, and dedicated pull-through heavy freight lanes with Megawatt Charging System (MCS) and vessel shore power provisioning.
Medium-voltage port microgrid & HT distribution
The electrical backbone that delivers high-power charging without destabilizing port DISCOM interconnects: 11 kV / 22 kV / 33 kV distribution, smart zone substations, CEA grid connectivity compliance, and automated dynamic load management.
Utility-scale battery energy storage systems (BESS)
Containerized Lithium Iron Phosphate (LFP) storage that decouples multi-megawatt charging spikes from the state grid. BESS captures captive solar generation, shaves costly DISCOM maximum demand penalties, and provides clean power buffers for heavy truck turnaround cycles.
Drayage energy intelligence & dispatch orchestration
The algorithmic scheduling engine that converts charging queues into deterministic turnarounds. Electric commercial vehicles are authenticated, prioritized by vessel departure deadlines and cargo criticality, and matched to high-power dispensers for guaranteed gate-readiness.
Central port energy command center & SCADA hub
A single pane of glass for port authority trustees and terminal operators: real-time telemetry across every dispenser, transformer, BESS container, and electric truck on terminal—with automated fault alerting, maintenance dispatch, and energy bill reconciliation.
Harit Sagar & MIV 2030 ESG analytics engine
The audit-grade reporting layer. Energy throughput, utility demand reduction, diesel displacement, and criteria air pollutant reductions (NOx, PM2.5, SOx, CO2e) are calculated directly from revenue-grade meters with documented EPA methodologies for statutory compliance and federal grant reporting.
02Heavy freight electrification
Port
Gate, terminal and berth-side movements. High-power charging at the point of dwell.
The infrastructure this requires
01
High-power charging
180–400 kW charging positioned where heavy vehicles already stop, not where they must divert.
02
Megawatt Charging System
Civil works, cable routes and substation headroom provisioned in phase one for MCS equipment later.
03
Overnight depot charging
Lower-power charging across long dwell periods — the cheapest energy in a freight operation.
04
Opportunity charging
Charging during mandated driver rest periods and scheduled gate waiting.
05
Charging reservations
Committed arrival windows so fleets can plan routes around guaranteed availability.
06
Truck queue management
Digital allocation of lanes and bays, with driver notification and re-sequencing.
07
Fleet APIs
Programmatic access to availability, reservations, sessions and settlement for logistics operators.
03Safety & infrastructure engineering
Sub-cycle fault clearing across 13.8kV/34.5kV and 480V networks
Final infrastructure design shall be subject to detailed engineering, Central Electricity Authority (CEA) safety regulations, and applicable Indian/IEC standards.
04Interoperability
Open Charge Point Protocol (OCPP)
Charging dispensers are procured against open management interfaces so the terminal operator is never vendor-locked to a single hardware manufacturer.
OCPP 1.6-J / 2.0.1 Open Alliance Certified
Automated Demand Response
Bi-directional automated load shedding and demand-response signaling with regional transmission operators (CAISO, PJM, ERCOT, NYISO).
OpenADR 2.0b Profile Certified
Terminal Operating System (TOS) Dispatch
Drayage arrival schedules, vessel discharge manifests, and container gate appointments are ingested directly from terminal systems (Navis N4, Tideworks).
Real-time Webhook / RESTful JSON / gRPC
SCADA & Substation Protocol Gateway
Feeder set-points, transformer temperatures, and breaker telemetry exchange directly with port industrial SCADA networks.
Modbus TCP / DNP3 / IEEE 1547-2018
Commercial Fleet Fueling & Toll Settlement
Commercial drayage lanes support credit cards, contactless NFC, and major US commercial fleet fueling cards with automated monthly settlement.
WEX / Comdata / PCI-DSS Level 1 Gateway
Enterprise ERP & Accounting
Substation kilowatt-hours, demand savings, utility bills, and concession revenues are pushed automatically to enterprise ERP systems (SAP, Oracle).
Enterprise API & SEC / GAAP Accounting Feeds
Automated Vehicle Identification & Plug & Charge
Instantaneous cryptographic handshake and automated billing upon cable connection, with RFID and J1939 telematics as fallbacks.
ISO 15118-2 / ISO 15118-20 Plug & Charge
05Cybersecurity
Layer 1 controls · Dispenser / Asset Edge
Role-based access
Permissions scoped by function and by site, reviewed on a defined cycle.
Multi-factor authentication
Required for every privileged and control-capable role.
Audit trails
Control actions recorded immutably with actor, time and prior state.
Backup and recovery
Documented recovery objectives, with restores tested rather than assumed.
Controls describe the architecture proposed for this concept. No certification, accreditation or third-party assurance is claimed or implied at this stage; formal assurance would follow the Authority’s own information-security requirements.
06Sustainability
Measured, not asserted
Simulated 12-month datasetEV charging sessions
0sessions
Basis · Rolling 12-month simulated total across all zones
Renewable energy delivered
0MWh
Basis · On-site generation consumed by charging and port load
Estimated diesel displaced
0litres
Basis · Modelled from electric mileage and reference commercial truck efficiency
Estimated emissions avoided
0tCO₂e
Basis · MoPSW Harit Sagar emissions accounting vs. grid baseline
Renewable contribution
0%
Basis · On-site generation as a share of total energy delivered
Electric fleet adoption
0%
Basis · Share of the operational fleet operating on electric drive
Charging network availability
0.0%
Basis · Connector uptime across Level 2, DC Fast, and HPC lanes
Reference emission factors
Reference factors aligned with US EPA eGRID and GREET heavy-duty drayage lifecycle emissions models.
What makes a figure auditable
Values shown are generated for demonstration of the reporting interface. They do not represent measured performance at any port.